Predicting Power Outage Duration in the U.S.

Author: Spence Lowery – lospence@umich.edu

Introduction

This project investigates the characteristics and predictors of major power outages in the United States from 2000 to 2016. I focus specifically on forecasting how long a power outage will last, using factors such as the number of customers affected, weather anomalies, and the root cause of the outage. Understanding these patterns can help utilities allocate restoration resources more effectively and improve infrastructure resilience.

My central question is:

Can we predict the duration of a power outage, using only information available at the time the outage begins?

I use data provided in the Power Outages dataset, which contains 1534 outages across all 50 states. Key features include:

Column Name Description
OUTAGE.DURATION Duration of the outage (minutes)
CUSTOMERS.AFFECTED Number of people affected
CAUSE.CATEGORY Root cause of the outage (weather, equipment failure, etc.)
ANOMALY.LEVEL Temperature deviation from average
RES.CUSTOMERS, COM.CUSTOMERS, IND.CUSTOMERS Breakdown of customers in each sector

Data Cleaning and Exploratory Data Analysis

To prepare the dataset for analysis:

Distribution of Outage Duration

The raw outage duration distribution is highly skewed. Most outages last under 100 hours, but some extreme events last over 3000 hours. I apply a log transformation for modeling.

Duration vs Cause Category

Outages caused by equipment failure or fuel supply issues tend to last much longer than those caused by weather or intentional attacks.

Duration vs Customers Affected

There is no strong correlation between how many people are affected and how long an outage lasts. This suggests other features, like the cause or infrastructure factors, may be more important.


Framing a Prediction Problem

I aim to predict the duration of a power outage, in hours, using features available at the start of the outage. Since duration is a continuous variable, this is a regression problem.


Baseline Model

I built a baseline model using a simple linear regression pipeline with:

Train/Test split: 80/20
Evaluation Metric: RMSE on log-transformed target

Baseline RMSE (log-hours): 1.3754

This corresponds to an average prediction error of ~2.4 hours on the original scale. A solid starting point.


Final Model

I engineered 3 new features:

I used a RandomForestRegressor with a tuned pipeline:

Best Parameters (via GridSearchCV):

Final Test RMSE (log-hours): 1.2209

This represents an ~11% improvement over baseline.

Actual vs Predicted Duration

The model is reasonably accurate for short to medium outages. For extreme outliers, predictions tend to under-shoot — common in imbalanced regression problems.